Action Plan Part 2
In part two of the action plan, I was able to incorporate the Building Foundation Tasks (1-4), Identify Student Learning Problem Tasks (5-12, and 13-14), and Verify Causes Tasks (15-17).
This part of the plan is designed to take place between Pre-planning (August), and Post-planning (May). This part of the plan includes the following components: Goal/ purpose, action/ activity, required time, materials, time frame, and who is involved in each step of the plan. Using parts one and two together will strengthen the entire plan.
Data coaches and other building staff members can benefit from using this template to design and implement such a comprehensive action plan.
In part two of the action plan, I was able to incorporate the Building Foundation Tasks (1-4), Identify Student Learning Problem Tasks (5-12, and 13-14), and Verify Causes Tasks (15-17).
This part of the plan is designed to take place between Pre-planning (August), and Post-planning (May). This part of the plan includes the following components: Goal/ purpose, action/ activity, required time, materials, time frame, and who is involved in each step of the plan. Using parts one and two together will strengthen the entire plan.
Data coaches and other building staff members can benefit from using this template to design and implement such a comprehensive action plan.